Construction Update: Grange Road

JULY 2025

We’re making excellent progress at our Grange Road development in the heart of Mount Eden.

  • Units 1–5 have now had their roofs completed and building wraps installed, marking a significant milestone in the build.
  • Units 6 & 7 are currently being framed, with the framing expected to be fully completed by the end of July.
  • Looking ahead, we aim to install all windows and complete the cavity system for Units 1–5 by early August.

 

Built for longevity and performance

Every home at Grange Road is constructed to an uncompromising standard:

  • We’ve built on a solid basalt rock foundation, ensuring strength and durability from the ground up.

  • We’re using the FPS® Weathertight® System, one of the best-performing building wraps on the market, to deliver exceptional weather protection.

  • All homes feature APL window systems—a trusted New Zealand-made premium joinery solution offering superior thermal and acoustic performance.

 

As a reminder, Block A is scheduled for completion in September/October, with just seven architecturally designed standalone homes available.

Interested in learning more?

Enquire today to receive our exclusive Grange Road Information Pack for Block A.